1. FSC Certified White Oak hardwoods are installed and awaiting sanding and finishing.

2. Master bath tile is complete and includes recycled glass accent tiles. All tile in home has a level of recycled content.

3.Kitchen is taking shape beautifully. Tile backsplash is in and under cabinet lighting. Currently we are waiting for installation of BOSCH stainless steel appliances which will include a refrigerator.

4. Painters will be coming through to touch up and finish trim painting this week.

5. Road is expected to be paved this week as well!

6. Sensored light switches in closets and baths are set to turn off when room is not in use. Bath fan sensors are used to operate when humidity is detected. Currently set to run for 30 minutes but are all adjustable for homeowner preference.

7. April Air filtration system is in. Homeowner may determine which level of filtration is needed. IE...allergy season, pets, etc.